18 The Woodlands

PROJECT SCOPE

Introduction:
Fourways Construction and Projects executed this comprehensive renovation project to enhance its aesthetics, functionality, and infrastructure. The project aimed to transform the property into a modern and efficient living space that meets the client's expectations.

paint application to the exterior walls of a residential house using roller brushes.

Project Objectives:
The main objectives of the project were as follows:
- Upgrade the property's interior and exterior appearance through repainting and tiling.
- Enhance the property's functionality by installing water backup systems, power gas, and plumbing facilities.
- Ensure compliance with safety and regulatory standards during gas service relocation and installation.
- Provide a complete scope of work that aligns with the client's requirements and results in a high-quality finished product.

Activities:
The following activities were undertaken as part of the comprehensive renovation project:

1. Repaint All Interior and Exterior Walls:
Inspect all interior and exterior walls for surface preparation, including cleaning, patching, and priming. Apply fresh coats of paint to interior and exterior walls to achieve a consistent and refreshed appearance.

2. Repaint All Surfaces (Including Window, Door Frames, Garage Door):
Prepare and repaint all surfaces, including window frames, door frames, and the garage door. This process involves sanding, priming, and applying new paint to ensure a cohesive and appealing finish throughout the property.

3. Tile Entire Property:
Tile the entire property, including floors and walls as necessary. This includes selecting appropriate tiles, ensuring proper installation, and achieving uniform tiling patterns to enhance the property's visual appeal and functionality.

4. Install Water Backup Systems:
Install water backup systems to ensure a continuous water supply during emergencies or water outages. This involves integrating water storage and pumping solutions to maintain essential water usage within the property.

5. Install Power Gas:
Implement a power gas system for efficient energy supply. This includes connecting gas lines, installing gas meters, and ensuring safe and compliant gas distribution within the property.

6. Relocate Gas Service + Install New Battle Cage:
Relocate the existing gas service to a designated location, ensuring compliance with safety regulations. Install a new gas battle cage to house gas equipment securely while maintaining accessibility for maintenance.

7. Install Plumbing + Exterior Basins:
Install new plumbing systems to support various areas of the property. This includes installing exterior basins for convenient outdoor water usage and ensuring efficient drainage and wastewater management.

Project Deliverables:
Upon project completion, the following deliverables will be provided:
- Refreshed and repainted interior and exterior walls.
- Renewed surfaces, including window and door frames, and garage door.
- Fully tiled property with cohesive patterns.
- Functional water backup systems.
- Operational power gas infrastructure.
- Relocated gas service and installed battle cage.
- Upgraded plumbing facilities and exterior basins.